Renovation blog · Germany

How do you budget for renovating an 80 m² apartment in Germany?

Start with a measured scope and the apartment you want to occupy. A useful budget includes work, owner purchases, professional services, temporary costs and remaining uncertainty, rather than just a contractor’s price per square metre.

Define the apartment and the finished result

Record rooms, measured areas, existing installations and retained finishes. Repainting an occupied home is different from renewing a vacant apartment’s bathroom, wiring and floors. Use a room schedule to state what stays, what changes and who specifies the result. Check substrate and installation condition before treating all visible work as straightforward.

Ask about common building elements before removing walls or changing a shared service. WEG section 5 distinguishes private from common property; location inside the apartment does not settle ownership. For the Berlin example, the district building authority is the appropriate contact for project-specific public procedure. Community consent and public permission are separate checks.

Allocate supply, installation and logistics

  • State who supplies tiles, sanitaryware, lights and doors, and who installs them.
  • Distinguish internal protection, debris carrying, external transport and disposal.
  • Define what electrical or water work is local to the apartment and what remains excluded.
  • Name professional surveys, design and checks separately.
  • Ask for payable totals, tax treatment, quantities, exclusions and offer validity.

The consumer guidance on commissioning trades supports detailed, comparable offers. A cheap quotation that omits supplied products is not a cheaper complete project. Add every known exclusion to the budget, even if its price is still provisional. Do not charge cabinet fitting twice when it is already in the kitchen supplier’s contract.

Build a complete funding example

Illustrative work package — EUR net
ItemAmount
Protection and site setup2 000
Demolition and internal carrying3 500
Specified electrical work6 500
Private water and drainage5 000
Bathroom substrates, waterproofing and tile laying7 200
Other rooms: wall and substrate repairs4 000
Other rooms: floor installation4 800
Painting4 500
Door/fixture fitting and final connections1 500
Checks and final cleaning1 000
Net work40 000
19% VAT7 600
Gross work47 600
Whole-project funding — EUR gross/final
ItemAmount
Gross work package47 600
Owner finish products11 900
Fitted kitchen and appliances16 660
Survey, design and agreed checks3 570
External deliveries and disposal1 428
Temporary living and storage2 400
Identified unresolved work allowance2 380
Chosen reserve7 616
Total funding93 554

Owner finish supply is EUR 10,000 net: EUR 5,000 of floor/wall products, EUR 3,000 of sanitaryware and EUR 2,000 of lights/door products. The kitchen is EUR 14,000 net including its agreed fitting and appliance supply; final service connections are in the work package. Electrical and private water rows cover rough services throughout the flat; bathroom construction and other-room finishes are separated. The kitchen supplier fits cabinets; the work package fits sanitaryware/doors and makes appliance service connections. The reserve is a chosen 10% of gross work plus those two purchase packages: EUR 76,160 × 10%. It is not a legal percentage.

Compare gross amounts and equivalent scope

The standard VAT rate is 19%, but a supplier’s actual tax position must appear in its offer. Do not add tax again to an already gross amount or apply the sample rate to every funding line. Here work is EUR 595/m²; complete funding is EUR 1,169.43/m² after rounding. Neither is a German average.

Send the same plan, specification and responsibility list to bidders. Keep a dated comparison of unit quantities, total price, exclusions and completion evidence. An allowance for an unanswered task remains visible until a firm scope replaces it. A square-metre headline cannot explain whether the kitchen, professional fees or temporary housing were counted.

Control choices without counting them twice

If included door products rise by EUR 600 net, the gross increase is EUR 714 under this example’s tax assumption. Using reserve leaves EUR 6,902 and preserves total funding. Keeping the original reserve raises funding to EUR 94,268. Record the replacement of the old item, not the entire new door order as an additional cost.

Put supplier deposits, contractor progress payments and professional invoices on one calendar. A payment reduces the remaining balance; it does not increase the contract price. Keep the EUR 2,380 identified allowance distinct from the reserve and explain which unresolved question it covers. Otherwise the same risk can quietly appear in both.

Decide when the budget is ready

  1. Resolve the main survey, ownership and permission questions.
  2. Issue one measured scope and final product schedule.
  3. Replace assumptions with complete gross offers where available.
  4. Agree inspection evidence and payment milestones.
  5. Keep unresolved items and reserve separate.
  6. Update the forecast whenever scope, tax treatment or timing changes.

Reno Pro can hold the work stages, purchases and recorded payments together. The accepted offers and professional documents remain the evidence behind the figures. Release the budget when you can explain what is included, who pays each item and how much money must still be available.

Sources, date and scope

Checked on 19 October 2026. Local examples concern Berlin unless stated otherwise. Check state law, heritage protection, community rules and actual work for the specific project. Teaching figures are invented euro amounts, not market prices or offers. The article projects are independent. Tax and funding calculations apply only under the stated assumptions; competent professionals resolve project-specific technical and legal questions.