Renovation blog · Ukraine

Contractor deposits and extra work: understand the actual renovation cost

Agreed price, accepted work and payment are three separate records. Keep them connected, approve changes and understand what remains to complete.

Cost, completion and payment are separate records

An agreed estimate describes the result and price accepted by the parties. Acceptance records which work has been completed and checked. Payment records how much money was handed over and for what. A deposit may precede work; a completed stage may remain unpaid. A bank statement is therefore not the full renovation budget.

Keep one current agreed cost and a separate payment history for each contractor. A UAH 20,000 transfer toward UAH 80,000 of work is part of the 80,000, not an additional cost. New agreed work changes the scope cost, not the historical bank-transfer record.

Questions before paying a deposit

  • Who receives it, and how are they connected to your agreement?
  • What does it fund: materials, reserving dates or part of the work?
  • How will it be credited against later payments?
  • What documents prove the transfer and purchases?
  • What happens to dates, surplus and settlement when scope changes?

There is no universal “correct percentage” for every renovation. Funding expensive equipment and paying labour are different situations. Agree the funding of particular needs and consequences of non-performance in writing; deposit and refund terms must be checked against your contract. “We always charge this” does not explain what you are financing.

A worked example without double counting

Cost, payments and funding limit, UAH
MeasureAmountExplanation
Original agreed scope170 000100 000 labour + 70 000 materials
Approved change12 000Added to cost once
Current agreed cost182 000170 000 + 12 000
Already paid70 00030 000 to contractor + 40 000 for materials
Balance under these agreements112 000182 000 − 70 000
Separate unused contingency18 000Not a debt to the contractor
Example funding limit200 000182 000 + 18 000

Do not add contingency to every invoice or automatically hand it to the crew. The original UAH 200,000 limit consisted of UAH 170,000 of work and materials plus a UAH 30,000 contingency. The UAH 12,000 change uses that contingency: agreed cost rises to UAH 182,000 and unused contingency falls to UAH 18,000. Within the same overall funding limit, this is not another 12,000 on top.

A process for extra work

  1. Record the reason: a new owner request, different substrate condition, product substitution or another circumstance.
  2. Describe the new result and how it differs from the original brief.
  3. Calculate labour, materials and associated costs, subtracting cancelled items.
  4. Show the impact on dates and other stages.
  5. Where circumstances permit, obtain approval before execution by the method set in the contract.
  6. Accept the result and link payment to the approved change.

Establishing the reason distinguishes a new order from correcting defective original work. Do not label every amount “extra” until you know what scope it adds or replaces. Record facts and seek appropriate advice if there is a dispute.

What a short change record looks like

Illustrative change CH-03
FieldRecord
ReasonInspection found an unsuitable part of the substrate
Original estimate itemFloor preparation, room 2
ChangeAgreed area, quantity and reinstatement method
Full difference+UAH 12 000, including materials and associated work
ProgrammeAgreed impact on completion and subsequent installation
ConfirmationDate, document version and approval by both parties
Work statusApproved → executed → accepted

Track payment separately: a deposit can precede execution. “As discussed yesterday” is not an adequate description. Add photographs or a sketch if needed to define the boundary. Link the old item and new version so they are not counted as two complete jobs.

Five checks before the next payment

  • Does the amount match the agreement or approved change?
  • Which stage and document support settlement?
  • Which deposits have already been credited?
  • Are materials you paid the seller yourself still included?
  • What outstanding commitment remains after this transfer?

If the crew receives purchasing funds, separate that advance from their fee and reconcile evidenced spending. Do not silently move an unexplained balance into labour payment. Document how final crediting is agreed.

Returns and closing the records

For returned material, record the original purchase, quantity, refund and actual crediting of money. Mark an expected refund separately; it does not yet increase available funds. Likewise, reconcile unused advances with the contractor instead of simply deleting them.

At completion, reconcile the original agreement, all approved changes, final cost, payments, refunds and agreed balance. Keep defects and correction deadlines separate from the payment history. Entering a defect in an app does not itself change your right to vary payment: contract terms and law apply.

In Reno Pro, record payments according to their purpose using the fields available in your version. The budget guide explains Plan, Fact and payments. The register above does not promise that the app automatically calculates every contractual measure.

Sources

Editorial source review: 18 October 2026. The numerical examples were created for teaching; they are not a contractor’s personal quotation. English translation reviewed on 18 October 2026.